head_banner

Acrel ABAT series Lead acid Battery String Monitoring System for BMS

Acrel ABAT series Lead acid Battery String Monitoring System for BMS

short description:

●BMS for lead acid battery

●Modbus communication

●string battery monitor for 2V, 6V, 12V batteries


Product Detail

Product Tags

Dimensions

dimension

Network

ABAT

FAQ

Q:After the meter is powered on, the power or energy count is inaccurate.

A:Switch the meter display to the power (active power P, power factor λ) interface, and check whether the power display is negative or not. And whether the power factor is between 0.9-0.95, and then check whether the incoming and outgoing wires of the current signal wire are connected reversely (that is, the current The incoming wire must be the same as the incoming wire end of the instrument) and consistent with the wiring diagram on the instrument.

Q:The instrument cannot communicate with the host computer normally after power on.

A:1. The voltage value between the communication output A and B of the measuring instrument should be between +(4.4-4.5)V;

2. Check whether the communication wiring method is correctly wired in accordance with the wiring diagram requirements (that is, the communication terminal A/B of the corresponding to communication serial port A/B);


  • Previous:
  • Next:

  • Write your message here and send it to us